complexType "ElectricityPhysicalLeg"
Namespace: |
|
Content: |
|
Defined: |
|
Includes: |
|
Used: |
|
XML Representation Summary |
<... |
|
|
|
> |
|
Content: |
payerPartyReference, payerAccountReference?, receiverPartyReference?, receiverAccountReference?, deliveryPeriods?, settlementPeriods+, settlementPeriodsSchedule?, loadType?, electricity, deliveryConditions, deliveryQuantity |
|
</...> |
Content Model Elements (11):
-
All Direct / Indirect Based Elements (1):
-
Annotation
Physically settled leg of a physically settled electricity transaction.
Type Derivation Tree
ElectricityPhysicalLeg
|
XML Source (w/o annotations (8); see within schema source)
<xsd:complexContent>
<xsd:extension base="PhysicalSwapLeg">
<xsd:sequence>
</xsd:sequence>
</xsd:extension>
</xsd:complexContent>
</xsd:complexType>
|
Content Element Detail (all declarations; defined within this component only; 7/11)
-
The physical delivery conditions for the transaction.
XML Source (w/o annotations (1); see within schema source)
-
The different options for specifying the Delivery or Supply Periods. Unless the quantity or price is to vary periodically during the trade or physical delivery occurs on a periodic basis, periodsSchedule should be used and set to 1T.
XML Source (w/o annotations (1); see within schema source)
-
The different options for specifying the quantity.
XML Source (w/o annotations (1); see within schema source)
-
The specification of the electricity to be delivered.
XML Source (w/o annotations (1); see within schema source)
-
LoadType is a summary of the full description of the settlement periods with respect to the region. Used for describing Electricity delivery schedules (e.g. Base, Peak, Off-Peak, Custom).
Simple Content
Enumeration: |
"Base" |
- |
Base
|
"Peak" |
- |
Peak
|
"OffPeak" |
- |
Off-Peak
|
"BlockHours" |
- |
Block Hours
|
"Custom" |
- |
Anything that does not fall under the predefined standard categories
|
|
XML Source (w/o annotations (1); see within schema source)
-
The specification of the Settlement Periods in which the electricity will be delivered. The Settlement Periods will apply from and including the Effective Date up to and including the Termination Date. If more than one settlementPeriods element is present this indicates multiple ranges of Settlement Periods apply to the entire trade - for example off-peak weekdays and all day weekends. Settlement Period ranges should not overlap.
XML Source (w/o annotations (1); see within schema source)
-
The specification of the Settlement Periods in which the electricity will be delivered for a "shaped" trade i.e. where different Settlement Period ranges will apply to different periods of the trade.
XML Source (w/o annotations (1); see within schema source)